Cheap LED Lights: How cheap on earth can make customers satisfied?

At present, LED manufacturers should meet the demand of LCD panel producers and LCD TV manufacturers, and meanwhile, the demand of LED backlighting producers. In order to deal with these situations, LED manufacturers speeded up the pace of cutting off costs and improving performances. In addition, they were also committed to increase productivity. They have the same goal: produce Cheap LED Lights to attract more consumers.

 

Cheap LED Lights: How cheap on earth can make customers satisfied?

 

In Japan’s LED lighting industry market, the cost-cutting target in 2014 of LED lighting applications was 0.5 yen/lm. The current cost is around 1-1.5 yen/lm. Originally, the government and Japan’s LED manufacturers planned to realize this target within 3 years, now reduced to 2 years. Thus, prices of LEDs will gradually be consistent with the LCD panel industry. In the aspect of performance, the government and related manufacturers planned to realize 200lm/W in 2014. At the current rate of development, this target can very likely be realized in advance.

 

Some experts expressed their support to the promotion of cheap LED lights. In their opinion, thank to the increasingly intense competitions among established LED makers and new-born LED producers, the trend of production costs dropping and performance improving “pushed” the entire LED lighting market into a larger virtuous circle.

 

For example, the current average price of LED bulbs is less than 4000 yen. If this price can keep pace with the dropping speed of LED chips, it is estimated that in about 2 years, the average price of LED bulbs will drop by half, which will definitely make LED bulbs completely take place of traditional filament bulbs and other energy-saving bulbs and become the dominate products in the residential lighting market.

 

In order to further occupy the lighting market, many LED makers began to invest in new technologies. Chips, phosphor and packaging, a lot of technologies that used on LED lighting applications has been improved at different levels.

 

However, in the aspect of economy, fluorescent LED (straight) tubes are far less valuable than traditional fluorescent lights. But this condition may probably be changed due to the estimated outburst of LED lights (costs reduction and improving performances) in 2014. Although the initial production costs of LED tubes are much higher than traditional fluorescent tubes, in consideration of the other aspects, like service life, power consumption and environmental production factor, customers may probably choose the former rather than the later.

12306?Bad design website, cheap led lights? Good design product

As we all know, the 12306 is such a bad design website. But I found a good design product, cheap led lights from Eneltec. Everybody know Eneltec only produce high quality LED Products, now, Eneltec have some new products, these cheap led lights make the Eneltec LED Lighting products could be sold very good in every area of the world. Cheap LED Lights, but with good quality, maybe that’s the reason why they sell so good throughout the world.

The official ticketing website of the Ministry of Railways specified 12306 is being questioned because of numerous problems 2012 since Spring Festival passengers to purchase tickets in www.12306.cn website process, suffered a “slow network”, “did not train set, but the money deducted to go” and other issues, the site-related equipment and facilities, etc. also been questioned. Morning, the reporter interviewed the Ministry of Railways, Railway Research Institute is responsible for 12,306 Internet ticketing systems, such as construction and operation of the experts, ask them to answer the questions of public concern.

Academy of Railway Sciences, executive vice president Kang Bear: 12306 Internet booking system is built on railway ticket system, step by step according to plan, not hastily. The ticket system in June 1996 was listed as “95″ national research programs in 1998 and is listed as “95″ priority projects of national research programs, the use of independent research and development of core technologies, common hardware and software platform and open technical route, which took two years of research and development success.