The perplexity faced by solar LED street lamp energy management contract model

According to the characteristic of “contract energy management”mode, a comprehensive analysis of the LED lights on the confusion of the process of implementation of  ” contract energy management “mode, and proposed the government to play a lending role, which is the current implementation of solar led street lamp in the city.

The perplexity faced by solar LED street lamp energy management contract model

As energy consumption country, China unit of GDP energy consumption is 3 times higher than in advanced countries. The production of specific power consumption of unit product is high from 50% to100% than developed countries. China is undergoing the transition from planned economy to market economy changing period. The original planned economy energy saving management system of solar led street lamp is more and more which can not adapt to the new situation, therefore, it is necessary to introduce and popularize energy-saving work based on market mechanism of energy-saving investment and service.

Energy management contract (EMC) is the arisen new energy conservation mechanism in the last century of 70’s. It is through energy service contracts signed with clients, for clients including energy audit, project design, project financing, equipment procurement, project construction, equipment installation commissioning, personnel training, recognition and energy saving service. And from the customer for energy saving in energy efficiency obtained profits of a business operation. Its essence is to reduce the energy costs to pay the full cost of energy saving project investment. This energy-saving investment mode allows the user to use the future energy-saving benefits for plant and equipment upgrades, reducing the operation costs, improving the efficiency of energy use.

The pattern has the following characteristics for solar led street lamp: one is the energy consumption enterprises without funds to complete the energy-saving technological transformation, which is so called “zero input”. second is the EMC liable for technical and economic risks, energy consumption enterprises pay to EMC payments from energy saving the project benefit, the user” zero risk”; three is the end of the contract energy saving equipment saving equipment and follow-up. and all the energy efficiency go back to energy consumption LED Downlight enterprises.

Contract energy management to a great extent handled the factors which emerged in energy conservation. It achieve win-win situation, and indeed a effective energy-saving invest mechanism, new pattern, which can be popularized quickly in the market mechanism and become the mainstream model of energy saving investment in Europe.